Material Selection Checklist
Date ____________ Customer ___________________ Project _____________________
Describe
the function of the part; ______________________________________________________________
______________________________________________________________
______________________________________________________________
Similar Products on the Market- _________________________________________________________
Wall section
- ________________________________________________________________________
Considerations (Relate to common plastic products if unable to quantify)
1. LOADS
1.1. Type
____________________
1.2. Magnitude
____________________
1.3. Duration
____________________
1.4. Frequency
____________________
1.5. Impact
____________________ (Single Impact or Repeated Impact)
1.6. Fatigue
____________________
1.7. Wear
____________________
2. ENVIRONMENT
2.1. Temperature
____________________
2.2. Chemicals
____________________
2.3. Humidity
____________________
2.4. Cleaning
Agents ____________________
2.5. Lubricants
____________________
2.6. UV
Light ____________________
2.7. Duration
____________________
3. ELECTRICAL
3.1. Voltage
____________________
3.2. Conductivity
____________________
3.3. Insulating
____________________
3.4. EMI/RFI
____________________
4. SPECIAL
4.1. Transparency
____________________
4.2. Paintability
____________________
4.3. Plateability
____________________
4.4. Color
____________________
4.5. Surface
Finish ____________________
4.6. Other
Appearance___________________
4.7. Flammability
____________________
4.8. UL
or C.S.A. ____________________
4.9. FDA
____________________
4.10. NSF
____________________
4.11. Other
Agency ____________________
4.12. Cost
____________________
4.13. Tolerances
____________________
4.14. Assembly
____________________
4.15. Sterilization
____________________
The properties
need to be ranked in order of importance because the selection process
will involve trade-offs of properties and price or within properties.
We must know what criteria must be held at all costs.
Steven L
Silvey
Sr. Technical
Service
GP-ADC
Slsilvey@ashland.com